Hingham Center for Active Living Bids Come In at $25.8 Million, Below Warrant Estimate
HINGHAM -- April 13, 2026, Hingham bids for proposed Center for Active Living come in at $25.8 million, $4 million below the warrant estimate. The Select Board held a final public information session Monday, with Town Administrator Tom Mayo announcing that contractor bids received the prior week came in well below the $29.9 million figure published in the town warrant, a $5.8 million reduction from the original feasibility study projection. The project, a 25,950-square-foot senior center on Bearcrow Park Drive, requires a two-thirds vote at town meeting and a subsequent ballot majority under Proposition 2 and a half, with borrowing structured in three phases beginning with a roughly $15 million bond anticipation note in FY27. Projected year-one operating cost increases total $239,301, including one new full-time custodian at $87,000. The Advisory Committee voted 9 to 5 in favor, below the required two-thirds threshold, and residents pressed the board on cumulative tax pressures, intergenerational access policy, and a 5-point gap between two senior population projections cited in planning documents.
Members read the rest of this story and every Hingham meeting we cover, in full.
Become a memberAlready a member? Sign inA 30-day free trial needs a payment method. After it, your membership renews at the price shown at checkout until you cancel, which you can do anytime from your account. Subscription terms
Share this story
Know someone in Hingham who follows town government? Share Townbrief Hingham: they can sign up free.